2001
October 31, 2001
October 25, 2001
August 16, 2001
- James G. Davis
Construction Corporation awards Potomac
Center-Phase One to
Arban & Carosi, Inc.
- Phase one of a two phase
project. Phase One is composed of approximately 75,000 ft2 of precast making
703 pieces. Precast will be located on the West, East and
South Elevations. East
Elevation from 1st floor to 8th floor is
existing concrete structure with new CIP columns.
The West and South elevation is new CIP construction up
to the 8th floor.
The footprint of the building above the 8th to
the 11th floor is new structural steel.
- The entire project will be
erected with contractors tower crane. Precast erection is
scheduled to start April 2002.
- Clark/Gilford joint
venture awards Arban &
Carosi, Inc. BWI
- Central Parking Garage.
- Cast in place structure clad in
Architectural Precast. Approximately 240,000 ft2 of precast.
Two helical exterior ramps are also clad in precast. The
project also consists of two structural precast exterior
stairs.
- Erection is scheduled for March
2002.
July 20, 2001
June 26, 2001
- Bovis Lend Lease,
Inc. awards Westfields
Parcel 43 To Arban & Carosi, Inc.
- 7 story steel structure clad
with 31,000 ft2 of detailed precast spandrel panels
with half round column covers at the building base.
June 08, 2001
- Turner Construction
awards Johns Hopkins
University, School of Medicine-Broadway Research Building
to Arban & Carosi, Inc.
- 12 story addition to JHU.
The first 10 stories is comprised of a concrete structure.
The remaining two floors are open and built with structural
steel. They will house roof top units and various
other mechanical units.
- The North, East and West
Elevations are clad with precast concrete and the remaining
South Elevation is finished in Curtainwall.
- The project is composed of approximately
66,000 ft2 of precast making 310 pieces.
The North Elevation will be erected with a mobile tower
crane. The remaining elevations will be erected with
Turner's tower crane. The heaviest piece weighs in at
40,500 lbs.
- Visit the Broadway
Research WebCam
April 19, 2001
March 30, 2001
March 13, 2001
March 12, 2001
February 16, 2001
January 31, 2001
January 18, 2001
- Final site photos
updated for Two Irvington
Center at King Farm
- Architects rendering
added to our George
Washington University, 1957 E
street.
- Hitt Contracting,
Inc. awards E.J.
Randolph to Arban & Carosi, Inc.
- 5 Story concrete structure with approximately
27,000 ft2 of precast.
- Precast erection scheduled for
September 1, 2001.
- James G. Davis Construction Co.
awards Capital One to
Arban & Carosi, Inc.
- 14 story steel structure with
approximately 116,000 ft2 of precast. Column
covers receive a deep fluting with a proud "fin" on
one side. Precast spandrels fill in the floor line between
columns.
- Precast located on North and
South Elevations will be done with a mobile crane. The
Longer East Elevation sits above below grade parking. As a
result this area will be done with the Contractors tower
crane. The remaining West Elevation is clad in curtain
wall.
- Precast erection
scheduled for December 1, 2001.
January 15, 2001
- Update to our
employment page. AutoCAD position available.
|